Aluminum window production time: how long does it take and what does it depend on?

Teegan CraftDec 3, 202524 min read
Aluminum window production time: how long does it take and what does it depend on?

Selection and order aluminum windows This is one of the key stages of building a home or implementing a commercial project. Clients often ask: “How long does it take to produce aluminum windows?” and “What does the order processing time depend on?”In this article, we answer these questions in detail, point out the best time to start the ordering process, and offer tips on how to avoid mistakes that can extend delivery times.

Selection and order aluminum windows This is one of the key stages of building a home or implementing a commercial project. Clients often ask: “How long does it take to produce aluminum windows?” and “What does the order processing time depend on?”In this article, we answer these questions in detail, point out the best time to start the ordering process, and offer tips on how to avoid mistakes that can extend delivery times.

How long does production take? aluminum windows?

Average production time aluminum windows usually ranges from 4 to 8 weeksHowever, this is only an approximate value, as the actual date is influenced by many factors:

  • Type of aluminum system – simple single-leaf windows are built faster than, for example, large HS sliding patio doors.
  • The degree of complexity of the structure – the more unusual the design (arches, corners, frameless connections), the longer the production time takes.
  • Colors and finishes – profiles in standard colors are available faster, while powder coating or anodizing in a non-standard color takes longer.
  • Availability of glass and accessories – anti-burglary, soundproof or additionally coated glass may require a longer delivery time from the manufacturer.
  • Production load – during the construction season (spring-summer) the waiting time may be longer than in winter.

What determines the delivery time for aluminum windows?

The total completion time includes not only the production itself, but also:

  1. Offer preparation and pricing – this time depends on the completeness of the data provided by the investor.
  2. Construction site measurement – a key stage that must always precede the start of production.
  3. Acceptance of the offer and signing of the contract – only then does the order go into execution.
  4. Transport and assembly – depending on the location and schedule of the installation team.

When is the best time to order aluminum windows?

The optimal moment to start the process of ordering windows is during the open shell stage, i.e. after the bricklaying is completed and before the facade work begins.

Important: Window measurements can only be taken after the masonry work is completed to avoid dimensional errors. Therefore, it is advisable to contact the manufacturer. 2–3 months before the planned installation – then there is time for pricing, design corrections and smooth production implementation.